Team Power Solutions Automation Group Completes First International Project

A Gold Mine located in Suriname, South America engaged Team Power Solutions in late 2020 to upgrade their PLCs onsite. After multiple flight delays, lost bags, and an overall travel nightmare, our four man crew arrived onsite for the panel replacement and commissioning.

Read the full story here.

Previous
Previous

Team Power Solutions Welcomes SIIT Students

Next
Next

Global Ventures Magazine Feature